projects

Recent projects

A selection of recent projects delivered for wind developers, investors, and consultancy partners.

WTG Package Support

Jan 2025 - Apr 2026

For Hyundai Yokji OWF / Doris — WTG Package Engineering Support

Independent assessment of OEM proposals with price benchmarking; HoTs, TSA, and SMA schedule reviews; EWA drafting inputs; tender evaluation matrix with red-flag analysis of key terms.

Contract Review EWA Drafting Tender Evaluation Red Flag Analysis
Doris logo

TDD & Bankability - MySE 18.5-260

Dec 2025 - May 2026

For Natural Power Consultants - European Wind Farm Client

Technical due diligence including factory, prototype and certification body visits in China; PSA/HoTs reviewed against lender expectations, plus climbing & inspection of the prototype turbine and a cyber-security risk assessment.

OEM Review Turbine TDD Site Visit
Natural Power logo

Expert Witness - WTG Main Bearing Failure

Nov 2025 - Apr 2026

For HKA

WTG Main Bearing Failure for a US based client.

Expert Witness Turbine TDD
HKA logo

Cost Modelling - Turbine Failure Rates

May 2024

For Apollo and Global Energy Group PR45 Report for ORE Catapult

WTG failure rate and standstill maintenance inputs

Failure Rate Analysis Turbine TDD
ORE Catapult logo

Cost Modelling - Western & APAC OEM Comparison

Feb - Mar 2024

For UK Floating Offshore Wind Farm Development

OPEX modelling of Chinese versus Western WTGs for a bottom-fixed UK project

Cost Modelling Turbine TDD Offshore

Lead Design Engineer

Jul 2024 - Feb 2025

For SEE

Lead Design Engineer providing cross-package Engineering Management for a UK bottom-fixed offshore wind development, including design basis, CAPEX estimates, Certification Management and Life Extension strategies.

Bottom-fixed
SSE logo

Technical support

Jan 2023 - May 2023

For Synera Renewable Energy - Formosa 4

Technical support to SRE Global’s Formosa 4 offshore wind farm; drafted WTG Employer's Requirements and tender evaluation frameworks from scratch.

WTG Employer's Requirements Tender Evaluation
Synera Renewable Energy logo

Led design basis, TDD and ITT

Jul 2023 - Mar 2024

For Flotation Energy / OWL

Led design basis, TDD and ITT for WTG package and floater OEM interfaces; OEM engagement through FEED and concept selection; OPEX modelling for O&M and SMA decisions.

Design Basis Due Diligence OPEX modelling OEM Engagement
Flotation Energy logo